English (United Kingdom)

CLL

Dust Extraction for Clinker Unloading

Modification of transport routes for the dispatch of cement products

The new solution includes two loading spouts equipped with modern filtration systems that minimize dust emissions during loading. This system contributes not only to the protection of the working environment, but also to a more efficient and controlled material handling process.

At the same time, the technical solution enables parallel loading – it is possible to simultaneously load rail tank wagons of the RAJ type or two road tank vehicles positioned side by side. This significantly increases the flexibility and continuity of dispatch operations.

expedicia 2

Video

Company Development

We invest in increasing production capacities and modernizing production equipment with the aim of developing the production of cements and blended binders. The implemented investments are directed towards higher production efficiency, faster dispatch, and the ability to respond flexibly to both time and volume requirements of our customers.

Environment

Strategic Investments

Other Key Investments

Are you interested in more information? Please contact us.

Invalid Input

Enter your name

Enter phone number

Enter valid e-mail

Please let us know your message.

Invalid Input

Please confirm your consent

Sales Department

obchod@cll.sk
+421 41 509 17 29